Free matching service by Voraus LLC. We connect you with independent local sealcoating and striping contractors. We are not a sealcoating contractor.
Home / Services / Lot Striping & ADA

Parking Lot Line Striping, Fire Lanes & ADA Compliance in Huntsville, AL

Crisp traffic-paint and thermoplastic pavement markings, ADA accessible stall layouts, fire lanes and wheel stops across the Huntsville metro.

Free matching service by Voraus LLC: We connect property owners and businesses in Huntsville, AL (Huntsville, Madison, Harvest and Toney, Meridianville and Hazel Green, Hampton Cove and Owens Cross Roads, New Market and Gurley, Triana, Decatur, Athens, Arab) with independent local sealcoating and striping contractors. We are not a sealcoating contractor and do not perform the work. Request a match below or call (256) 388-4516.

2010 ADA Standards Parking Stall Count Reference

Total Parking Spaces in LotMinimum Required Accessible SpacesMinimum Van-Accessible Spaces (within total)
1 to 25 spaces1 accessible space1 van-accessible space
26 to 50 spaces2 accessible spaces1 van-accessible space
51 to 75 spaces3 accessible spaces1 van-accessible space
76 to 100 spaces4 accessible spaces1 van-accessible space
101 to 150 spaces5 accessible spaces1 van-accessible space
151 to 200 spaces6 accessible spaces1 van-accessible space

Avoiding ADA inspection delays and trip-hazard liability

Whether you are re-striping fresh black sealcoat, refreshing faded yellow/white stalls on concrete or asphalt, or chalking a brand-new layout for a certificate of occupancy in Huntsville or Madison, ADA stall dimensions matter. A standard accessible space requires an adjacent 5-foot hatched access aisle, while a van-accessible stall requires either an 11-foot stall with a 5-foot aisle or an 8-foot stall with an 8-foot aisle, plus reflective vertical signage mounted at least 60 inches above the pavement surface.

Crews use high-pressure airless line-lazers with fast-dry DOT acrylic or chlorinated-rubber traffic paint (and glass beads where reflective markings are specified) so stalls reopen within an hour.

Checklist for a parking lot striping or ADA upgrade request

  • Restripe over visible existing lines vs. new chalked layout after sealcoat or paving.
  • Approximate stall count, directional arrows, crosswalks, 'NO PARKING FIRE LANE' red curb footage, and numbered stalls.
  • Need for concrete/rubber wheel stops, steel pipe bollards, or aluminum ADA signs.

Common questions: lot striping & ada in Huntsville, AL

How often should a commercial parking lot be restriped in Huntsville?

High-traffic retail centers, restaurants and medical offices typically refresh their stall lines, crosswalks and fire lanes every 18 to 24 months, and always immediately following a sealcoat application.

Can you stripe a concrete parking lot as well as asphalt?

Yes—crews prep concrete surfaces and apply commercial traffic paint or thermoplastic markings with high-visibility contrast borders.

Related Huntsville sealcoating guides & pages

Ready when you are

Ready to get your sealcoating project moving?

A short request is enough to get started: "Church lot, about 120 spaces, last sealed 5 years ago, needs crack fill, sealcoat and restripe, prefer a weekday in May."

Start my free request Call (256) 388-4516Free matching service by Voraus LLC. We connect you with independent local sealcoating and striping contractors. We are not a sealcoating contractor and do not perform the work.
Start my free request